End the cycle of pigeon complaints on common-property roofs. SWMS-documented installs, fixed per-metre pricing the committee can vote on, and photo evidence for your records.
Common-property roofs concentrate everything pigeons want: multiple solar arrays, large undisturbed roof areas, and nobody whose job it is to look up. By the time residents start logging complaints about noise, droppings on balconies and driveways, or panels visibly fouled, the colony is usually well established.
For committees and managers, the cycle is familiar: a complaint, a one-off pest call-out, a quiet month, and then the same complaint again. Dispersal doesn't hold because the nesting habitat under the panels never changed. Physical exclusion does — once the perimeter is meshed, the complaints stop because the problem actually ends.
Strata work has different requirements to a private home. We've built the process around them.
Full Safe Work Method Statement documentation before work starts, working-at-heights certified technicians, and fall protection on every roof. Everything your records and your insurer expect for common-property work.
Fixed per-metre pricing ($23/m inc. GST, all-inclusive) itemised per building or lot, so the committee votes on one clear number. No variations, no surprise call-out fees, no re-quotes after access.
Photo and video completion reports for every array — before, during and after. Managers get documentation that the work was done, the nests were cleared, and the perimeter is sealed.
We inspect the roof areas, count arrays and measure perimeters, photograph the current state, and identify access requirements. For occupied buildings we plan around residents — no scaffolding surprises.
One document: scope, per-metre pricing across all arrays, SWMS, insurance details and timeframes. Built to be tabled at a committee meeting without follow-up questions.
Nest and debris removal, then epoxy-coated 304 stainless mesh clipped to the panel frames — no drilling into the roof membrane or tiles, so building warranties stay intact. Multi-building sites are sequenced to minimise disruption.
Photo and video evidence per array, warranty documentation (10-year product, lifetime labour), and an invoice structured the way your strata accounts need it.
Yes — a Safe Work Method Statement is prepared for every strata and commercial job before work starts, and insurance certificates are supplied with the quote so the committee has everything in one pack.
Yes. We measure every array across the site and present one fixed quote itemised per building or lot at $23 per metre all-inclusive. Larger sites and staged works can be scheduled across multiple visits under the same quote.
The contracting party — normally the body corporate — holds both the 10-year product warranty and the lifetime labour warranty. Full terms are published in plain English in our Terms & Conditions.
No. All work happens on the roof with our own access equipment. We coordinate timing with the building manager, and residents just get notice that contractors will be on-site.
SWMS documentation, fixed $23/m pricing, photo completion reports for the body corporate records.